<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Smart Power Grid</title>
	<atom:link href="https://spgrid.bg/en/feed/" rel="self" type="application/rss+xml" />
	<link>https://spgrid.bg</link>
	<description>Smart Power Grid Ltd</description>
	<lastBuildDate>Wed, 21 Dec 2022 11:34:02 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://spgrid.bg/wp-content/uploads/2022/11/cropped-favicon-32x32.png</url>
	<title>Smart Power Grid</title>
	<link>https://spgrid.bg</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Won the tender for the supply of CCP to ENERGO-PRO in the next 4 years</title>
		<link>https://spgrid.bg/en/won-the-tender-for-the-supply-of-ccp-to-energo-pro-in-the-next-4-years/</link>
		
		<dc:creator><![CDATA[]]></dc:creator>
		<pubDate>Wed, 21 Dec 2022 11:30:54 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://spgrid.bg/?p=1319</guid>

					<description><![CDATA[<p>Public procurement contract 35-2/10.09.2021 Contracting authority &#8211; Elektroraspredelenie Sever AD Subject &#8211; Delivery and installation of a concrete complete transformer substation (BCTP) monolithic type. Types of CCP &#8211; 1&#215;1000 kVA and 2&#215;1000 kVA Contract period – 48 months The contract was concluded on the basis of the estimated value for the second separate position of&#8230;</p>
<p>The post <a rel="nofollow" href="https://spgrid.bg/en/won-the-tender-for-the-supply-of-ccp-to-energo-pro-in-the-next-4-years/">Won the tender for the supply of CCP to ENERGO-PRO in the next 4 years</a> appeared first on <a rel="nofollow" href="https://spgrid.bg/en">Smart Power Grid</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>Public procurement contract 35-2/10.09.2021<br />
Contracting authority &#8211; Elektroraspredelenie Sever AD<br />
Subject &#8211; Delivery and installation of a concrete complete transformer substation (BCTP) monolithic type.<br />
Types of CCP &#8211; 1&#215;1000 kVA and 2&#215;1000 kVA<br />
Contract period – 48 months<br />
The contract was concluded on the basis of the estimated value for the second separate position of the public procurement, which is BGN 456,000 without VAT.</p>
<p>The post <a rel="nofollow" href="https://spgrid.bg/en/won-the-tender-for-the-supply-of-ccp-to-energo-pro-in-the-next-4-years/">Won the tender for the supply of CCP to ENERGO-PRO in the next 4 years</a> appeared first on <a rel="nofollow" href="https://spgrid.bg/en">Smart Power Grid</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Won the tender for the supply of CCP to EVN in the next 2 years</title>
		<link>https://spgrid.bg/en/won-the-tender-for-the-supply-of-ccp-to-evn-in-the-next-2-years/</link>
		
		<dc:creator><![CDATA[]]></dc:creator>
		<pubDate>Wed, 21 Dec 2022 11:30:13 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://spgrid.bg/?p=1317</guid>

					<description><![CDATA[<p>After a public procurement for the supply of CCP 1&#215;800 kVA by Elektrorazpredelenie UG, &#8220;Smart Power Grid&#8221; was announced as the winner. The supply contract was signed on March 16, 2022, with a deadline for implementation within the next two years. The contract has a non-binding value and is worth BGN 2957841 excluding VAT.</p>
<p>The post <a rel="nofollow" href="https://spgrid.bg/en/won-the-tender-for-the-supply-of-ccp-to-evn-in-the-next-2-years/">Won the tender for the supply of CCP to EVN in the next 2 years</a> appeared first on <a rel="nofollow" href="https://spgrid.bg/en">Smart Power Grid</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>After a public procurement for the supply of CCP 1&#215;800 kVA by Elektrorazpredelenie UG, &#8220;Smart Power Grid&#8221; was announced as the winner. The supply contract was signed on March 16, 2022, with a deadline for implementation within the next two years. The contract has a non-binding value and is worth BGN 2957841 excluding VAT.</p>
<p>The post <a rel="nofollow" href="https://spgrid.bg/en/won-the-tender-for-the-supply-of-ccp-to-evn-in-the-next-2-years/">Won the tender for the supply of CCP to EVN in the next 2 years</a> appeared first on <a rel="nofollow" href="https://spgrid.bg/en">Smart Power Grid</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
